Main stages of repair works in the home

Main stages of repair in the apartment.

How to begin repair of the apartment?

image

The first phase of the repair of old apartment or condos is the destruction and dismantling first off of the worn out walls and partition walls, getting rid of the wall and ceiling covering. This stage is one of the most "filthy" phases of the repair work.

One more among the most essential and "dusty" works is the window block replacement. It is needed to do this to start with due to the fact that dirt and dust will be unallowable throughout following stages and it is restricted at all to open windows during painting and wallpaper works (large drops of the temperature level and moisture are unallowable). After installing windows and windowsills it is needed to pack them instantly in polyethylene film and to cover windowsills in addition by the fiberboard (in order to avoid scratches).

The following stage is electrical wiring. Electrical wiring can be installed in walls or along the floor. Circuitry is made inside the pipes to ensure electrical security and increase reliability. The pipe safeguards electrical wiring from external damages and enables to replace the wire completely without breaking walls and floor just by inserting the brand-new wire instead of the old one.

House Painting follows the circuitry. The frequent mistake during the simultaneous conducting of such works happens when employees forget to lay out among the cables and home painters have actually currently plastered and ravelled the wall. As a result, extra works are required to seal chases after on the finished wall. The places of the feed switch and wall outlet area and their number must be thought-out ahead of time. The plan of power circuitry is usually consisted of into the design project.

Later on the system should be ready to service in case of failures. In addition to the electrical wirings, the telephone cable and the TV cable are laid out. The power cable television must not be set out near the telephone and antenna cables to prevent sound pickup and interference. The most peculiar minute is laying out the television cable television. In order to make two (or 3) television set in the house the 2nd cable television is frequently just "firmly soldered" in parallel, so the cable resistance is lowered. As a result, the screen quality is deteriorated, numerous programs can't be received and etc. In order to avoid such situation it is necessary to invite an expert with unique devices. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-lasting procedure, that is why it is performed simultaneously in all facilities, if it is possible. Hold-ups are linked with the technology. Each used layer of the plaster (or completing ending up) need to dry completely before the work will continue.

Works in sanitary arrangements and the cooking area begin at the same time with house painting. It is much better to meet so-called "filthy" operate in the top place and concurrently. In accordance with the strategy of the sanitary specialist area welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.

Then works in hygienic arrangements are conducted according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the flooring. And at last other hygienic gadgets, mixers and accessories are mounted.

After electrical wiring, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not installed throughout this phase in order to save their surface area look. The surface puttying of walls is performed all at once. The technically exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines moisture of the material.

The following stage is the procedure of fill. Fill can be made with various materials-- from typical masonry cement-sand mix to self-aligning floors. The advantage of the basic mix is its cheapness, the drawback is that such mix is much harder aligned at the level and the last dry time of such fill is 40 days, just then the next phase of the work with flooring can be conducted, i.e. the duration is too long. Self-leveling self-aligning floorings are far more costly, however more technological. Lining local plumber services up takes place almost "immediately" i.e. fluid solution of mix is poured out, then it runs and you receive the horizontal surface. The final dry time is 15 days i.e. you have considerable time economy. The system "warm flooring" is installed into the fill. If the so-called "damp processes" are inapplicable the innovation of the dry aligning (the fill technology) is used bases for floorings with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors should take into the account density of future flooring covering. After installation the door can be removed its hinges and removed until completion of repair work or packed into polyethylene film to protect from damages. All at once ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile should be laid on the absolutely dry overlay.

Finishing of the floor mounting depends on the planned covering. In many cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.

In premises where finish covering of the flooring is laminated floor covering or parquet hoard, the ordinary wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.

If surface covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The pointed out consequence is connected just with such scrambling procedure when the terrific amount of dust is produced. In spite of the truth that great floor mills are equipped with the vacuum, the enough quantity of dust is sped up on surrounding subjects including walls. Dust is extremely acerbic and is severely washed off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not absorb the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be finished. It is left just to set up the plinths, ornamental components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is needed to keep in mind that the series of works was noted in basic and can alter depending upon the guaranteed scenario-- the number of rooms in property, your resources, peculiarities of the construction of the multilevel facilities. It is based on common sense and everyone efficient in analysis can separately create such a sequence.